Introduction:
The
Facilities’ Committee at Hebron School overseas ‘new work’ on both the
Lushington and Selborne campuses. This work, sometimes subject to local
planning approvals, is financed out of annually budgeted income in the
main but occasionally from donations.
The Committee
consists of the Principal, the Maintenance Supervisor, the Public
Relations Officer, selected staff on both campuses and two senior
students. It meets on average four times a term and its reports go to
Senior Management and then to the School Council.
Outstanding
work awaiting planning permission:
-
Selborne:
two staff flats to be built behind the A level Dorm building
-
Lushington:
the ‘centenary’ building alongside the Sports’ Hall. This will consist
of the Maintenance workshops, the Technology Department and the Art
Department. Approval awaited since 1998!
Work completed since May 2007:
-
The second squash court converted
into two new facilities on separate floors: a weights’ training room; a
drama studio
-
Re-location of the UPS
(uninterrupted power supply) for the ‘Treetops’ (computer) building
-
A pitched roof on ‘Hillside’ (A
level boys’ Dorm) for a drying area and a social space but also for
rainwater harvesting
-
Art Department modification: an
expansion into the ‘old’ girls’ dayroom
-
Support Staff maintenance
workshop: creation of a social space, principally for the men to have
their school provided lunch
-
‘Silverdale’ Dorm: provision of
(temporary) extra space for six A level boys
-
Conversion of old Audio-Visual
room into a Music Room: this has space for computers (A level and IGCSE
music)
-
Installation of a toilet for the
Early Learning Centre
-
Modification of staff family flats
at Selborne (Brighton Cottage) and Lushington (Cypress Court)
-
Fencing along the Toda village
path
Work currently underway / to be
done soon:
-
Conversion of the ‘Treetops’
meeting room for use by DPD (Department of Personal Development)
-
Benches for the Staff Dining Room
to increase space
-
Fencing for the ‘Ebenezer’ grass
field
-
Boundary fencing upgrade
-
Tarring of the main drive at
Lushington
-
‘Titch Pitch’ grassing, fencing
and car parking space
Projects being considered for
the near future:
-
Re-roofing: ‘Middle Cottage’; the
Physics Laboratory
-
Retaining walls: rebuild of those
near Middle School; new one for the bank opposite the chemistry lab;
continuation of the ‘Big Pitch’ wall
-
Improvement of the Middle School
corridor (lighting, space)
-
Swimming pool: tiling the sides to
aid with cleaning (changing space and solar heating is an Alumni
Project)
-
Assembly Hall re-roofing
-
Restructuring of the DPD offices
-
Laundry / dhobi feasibility study
-
Technology workshop re-fit
-
A level boys’ bath house
renovation
-
Glenrock Dorm re-fit
-
Fire Exit from ‘Treetops’ top
floor
Alastair Reid (Principal)
1st September 2007
|